Facilities

Production










Training & Development







Quality and Lab






Environment Management






Management Tools




 

Fully Automatic and semi-automatic plating lines for barrel as well as vat components All D.C. rectifiers duly thyristerised with a ripple factor less than permissible.
All the processes are automated with ampere hour meters with cut off circuits and buzzers,Temp Controllers,Timers.
DG backup for power failure situations.
The plating process of every component is frozen after achieving required results consistently.
Spray Jets,Level Contollers, Auditory signals for shot up Temparatures, auditory signals indicating heater failures.
Security cameras for close monitoring of processes and fault findings
Training personnel in 5S implementation.

Training with audio Visual clips,Training and evaluation Softwares.
Five days Kaizen programmes which includes 2 days class room training.
Bring in cultural change in the team by way of personality development training programmes.
Team members focussed on knowing the objective rather than accomplishing only efficiently.
Growing the Leaders from within.


Hull cell test apparatus.
In-house Bath Chemicals Analysis Laboratory.
CASS test & salt spray apparatus.
Non-destructive and Destructive plating thickness measurement instruments.
Utmost cleaning level is achieved by ultrasonic cleaning technology.
Oven for heat and quench test.
5x, 50x, and 200x Digital Magnifying Glass for Inspection.

Pollution discharge permit/environment license according to National Standards.
Compliance with pollutant discharge limits specified in the permit.
Water control equipment installed in the plant.Reuse of treated water.
Air pollution control equipment installed at the plant.
Arrangements for disposal of solid and hazardous wastes.
Pollution prevention/cleaner production assessment implemented in the plant.
Scrubbers at every location , Ultra modern ETP.

Implementation of ,
A.5-day KAIZENS for
    i) Elimination of wastes
    ii) Total employee involvement
B. Lean production systems